ISTANBUL / ÇATALCA
Project data :
The project consist of 4 floors ( basement + first + clerestory +
penthouse ) which is located in Çamlıca Muratbey district; office,
design, production and storage have been planned to coexist.
A structure have been constructed which is capable of producing
200.000 t-shirts, 45.000 sports jacket, 180.000 jeans and tights,
250.000 shorts per month.
The project’s ferroconcrete is completed with conventional system form
in our undertaking.
EMPLOYER : BARCO TEXTILE IND. TRADE INC.
TOTAL CONSTRUCTION FIELD : 18.320 m2
JOB CONTENT : TURN-KEY (CONTRACTOR)
DURATION OF THE WORK : STARTING/ SEPTEMBER 2009 - ENDİNG/ DECEMBER 2010